Reports

Filter by
Energeia logo
  • All
  • Consulting
  • Decarbonisation
  • DER
  • Digitisation
  • Distribution
  • Electricification
  • Electricity
  • EV
  • Infrastructure
  • Intelligence and Data
  • Natural Gas
  • Policymakers
  • Regulation
  • Transmission
  • Transport

Moreno Valley Integrated Resource Plan (IRP)

Energeia was engaged by Moreno Valley Utility (MVU) to develop their 2023-25 Integrated Resource Plan (IRP). As part of this process, Energeia will be analyzing ...
INSIGHTS

Kenmore Electric Vehicle Infrastructure Plan (EVIP)

Energeia was engaged to conduct the technical modeling of electric vehicle (EV) adoption, charging energy needs, charger siting and grid integration for the City of ...
INSIGHTS

MD/HD Transport Electrification Investment Assessment

The Environmental Defense Fund partnered with Black & Veatch and Energeia to identify the impacts of the anticipated increased electrification on the electric grid system.
INSIGHTS

FCRTA Electrical Grid Analysis Study

Fresno County to identify the impacts of the anticipated increased electrification on the electric grid system.
INSIGHTS

Zero-Carbon Portfolio Study for Valley Clean Energy

Valley Clean Energy’s 2021-2023 Strategic Plan which contains goals related to VCE’s power resource portfolio as well as decarbonization
INSIGHTS
electric vehicle charging station

Kings County Electric Vehicle Readiness Plan

Kings County was developed to support increased adoption of Plug-In Electric Vehicles (PEVs) within the county.
INSIGHTS

Study of Consequential Issues Materially Affecting Kansas Electricity Rates

Kansas Legislature passed the Substitute for Senate Bill 69, calling for a study of retail electricity rates of KS electric public utilities.
INSIGHTS

Fresno Council of Governments: Electric Vehicle Readiness Plan

Kings County was developed to support increased adoption of Plug-In Electric Vehicles (PEVs) within the county.
INSIGHTS
Scroll to Top